Skip to content
// SOLUTIONS · PRODUCT OWNERS

Product intent converted into executable delivery.

Capture intent in any format. Get a PRD, backlog, acceptance criteria, and live progress — all linked.

99.98%
Uptime
14.2ms
Latency
128/128
Nodes
solutions · live fig_product-
// PRODUCT OWNER PROBLEMS

What slows the role down.

Intent gets lost

A great call becomes a vague Notion doc nobody reads.

Backlog drift

Tickets contradict the PRD which contradicts the design.

No traceability

You can't prove which ticket implemented which acceptance criterion.

Status guessing

Standups become detective work.

// REQUIREMENTS → BACKLOG

How intent flows.

  1. 01 // CAPTURE INTENT

    Capture intent

    Voice, video, doc, or call transcript.

  2. 02 // PRD GENERATED

    PRD generated

    Structured PRD with criteria.

  3. 03 // APPROVE PRD

    Approve PRD

    You sign off; version locks.

  4. 04 // BACKLOG CREATED

    Backlog created

    Epics, stories, tasks tied to criteria.

  5. 05 // MISSION PLAN

    Mission plan

    Delivery lead approves; execution begins.

  6. 06 // DELIVERY VISIBILITY

    Delivery visibility

    Live progress, defects, evidence, release status.

  7. CH · 07 · CONTINUE
  8. CH · 08 · CONTINUE
// TRACEABILITY

What every acceptance criterion produces.

// RELATED

Keep reading.

// INITIATE

Start a Software Factory pilot.

Connect one repository, one ticketing tool, and one mission. See evidence in days, not quarters.